Implementation of 13 development projects in Baghlan province

content_manager
شنبه ۱۳۹۸/۱/۱۷ - ۱۴:۵۶
Baghlan

At a total cost of AFNs, 19.9 million the construction work of 13 welfare projects have been recently completed and handed over through the National Citizen’s Charter Program of the Rural Rehabilitation and Development Ministry (MRRD) in central Baghlan district of Baghlan province.

These projects include: digging of 55 semi deep water wells, construction of water supply network, 1695 meters irrigation Canal and a 465 meters long protective wall that by the implementation of the mentioned projects the problems of 2312 families have been solved now they have access to clean drinking water, irrigation of the agriculture lands and protection of the flood risks.

It is worth to be mentioned that during the implementation of the mentioned projects, 8858 lobar days were also created.

تازه ترین اخبار

چهارشنبه ۱۴۰۴/۸/۷ - ۸:۴۶
Background image

جلسه هماهنگی با نماینده گان مؤسسات از طریق وزارت احیاء و انکشاف دهات دایر گردید

تحت ریاست محترم الحاج ملا محمد یونس آخند زاده وزیر احیاء و انکشاف دهات قبل از ظهر امروز جلسه هماهنگی در ارتباط به آب و حفظ الصحه با نماینده گان مؤسسات تدویر یافت .

در این جلسه که در. . .

سه‌شنبه ۱۴۰۴/۸/۶ - ۱۳:۵۱
Background image

کار پروژه ‌های انکشافی آبرسانی برای مهاجرین عودت کننده در ولایت ننگرهار آغاز شد

کار ساخت (۹) شبکه‌ آبرسانی در کمپ ‌های جدید مهاجرین عودت ‌کننده در ولسوالی ‌های خوگیانی، رودات و پچیراگام، همچنان کار ترمیم (۲۰) شبکه‌ آبرسانی و (۵۰) حلقه‌ چاه در ولسوالی ‌های سرخرود و. . .

سه‌شنبه ۱۴۰۴/۸/۶ - ۹:۲۵
Background image

(۲۷) شبکه آبرسانی در مربوطات ولایت ننگرهار به بهره برداری سپرده شد

کار ساخت (۲۷) شبکه آبرسانی در مربوطات (۱۷) ولسوالی ولایت ننگرهار و کمپ عمری تورخم به ارزش  (۱۴۷)  میلیون افغانی از طریق وزارت احیاء و انکشاف دهات امروز طی محفلی توسط محترم الحاج ملا. . .

BACK TO NEWS