At a cost of more than AFNs 5 million funded by the National Water Supply Sanitation and Irrigation program of MRRD, the construction work of one solar water Supply network has been recently completed and handed over in now abad e Safly village of Nahr Shahee district of Balkh Province.

This network which has been completed in two stages includes :  Digging of 90 meters depth  water  well , Construction of a 20 cubic meter high reservoir , 5 km pipe , installation of 27 solar boards , one water pamper and 435 water taps in the houses .

During the implementation of the mentioned project, 164 lobar days were created and after accomplishment 700 families have gotten access to save drinking water (potable water).

تازه ترین اخبار

سه‌شنبه ۱۴۰۵/۷/۱۴ - ۵:۴۱
Background image

سرک خامه واخان ولایت بدخشان تکمیل و به بهره‌ برداری سپرده شد

کار ساخت سرک خامه به طول (۱۲۱)کیلومتر از منطقه بروغیل ولسوالی واخان تا سرحد چین، به هزینه مجموعی (۳۶۵) میلیون افغانی که در دو فاز از سوی وزارت احیاء و انکشاف دهات تکمیل گردید، امروز طی. . .

یکشنبه ۱۴۰۵/۷/۵ - ۴:۳۲
Background image

کار ساخت یک پل در ولایت زابل آغاز شد

کار ساخت یک پل به طول (۴۰) متر در قریه جعفر علی خیل ولسوالی شاجوی ولایت زابل به مصرف (۱۷٫۵) میلیون افغانی توسط محترم الحاج مولوی عبدالرحمن حلیم معین مالی و اداری وزارت احیاء و انکشاف. . .

شنبه ۱۴۰۵/۷/۴ - ۹:۴۷
Background image

کار ساخت (۲،۰۸۹) کیلو مترسرک جغل‌ فرش در مربوطات ولسوالی علیشنگ ولایت لغمان آغاز شد

کار ساخت  (۲،۰۸۹)  کیلو متر سرک جغل‌ فرش از منطقه واینگل الی اولیا بالای ولسوالی علیشنگ ولایت لغمان به مصرف حدود (۲۰) میلیون افغانی توسط محترم الحاج محمد ارسلاح خروتی معین امور آبادی. . .

BACK TO NEWS