A solar-powered water supply network handed over in Kunar province

Ehsan_admin
Tue, Dec 31 2019 5:43 AM
کنر

With the total cost of 2,978,000 AFN, funded by UNICEF, a solar-powered water supply network has been recently completed and handed over through the national Rural Water Supply, Irrigation and Sanitation Program (Ru-WatSIP) of the Ministry of Rural Rehabilitation and Development (MRRD) in Khani Ba Ba village of Sarkano district of Kunar province. The water supply network had 1800 meters length, a 20-cubic meter water reservoir and 20 taps. With the completion of this water supply network, over 70 families got access to clean drinking water.

Latest news

Wed, Sep 23 2026 5:41 AM
Background image

معین امور آبادی دهات وزارت احیا و انکشاف دهات از دریای کنر دیدن نمود

بر اساس حکم ریاست‌ الوزراء امارت اسلامی افغانستان و فیصله معاونیت اقتصادی، وزرای محترم وزارت ‌های آب و انرژی، زراعت و مالداری، صنعت و تجارت، و الحاج محمد ارسلاح خروتی معین امور آبادی. . .

Mon, Aug 31 2026 6:43 AM
Background image

Coordination meeting held with representatives of institutions by the Ministry of Rural Rehabilitation and Development

A coordination meeting, led by His Excellency Al-Hajj Mullah Abdul Latif Mansour, Minister of Rural Rehabilitation and Development, was held this morning with representatives of. . .

Sun, May 17 2026 8:01 AM
Background image

The Honorable Minister of Rural Rehabilitation and Development met with the Ambassador of China and his accompanying delegation.

Honorable Alhaj Mullah Abdul Latif Mansoor, Minister of Rural Rehabilitation and Development, met today in his office with Mr. Zhao Xing, the Ambassador of China to Afghanistan, along. . .

BACK TO NEWS