A solar-powered water supply network handed over in Khost province 

content_manager
Sun, Jun 16 2019 2:32 PM
Khost

solar-powered water supply networks has been recently completed and handed over through the national Rural Water Supply, Sanitation and Irrigation Program (Ru-WatSIP) of Ministry of Rural Rehabilitation and Development (MRRD) in Shadal village of Ismail Khel (Mandozi) district of Khost province.
The project cost 3.5 million AFN which were funded through the State budget by Ministry of Finance (MoF). The project included digging of a 108-meter deep well, extension of a 2,600-meter long pipe network, construction of a 20,000-liter reservoir and installation of 79 taps, 27 solar panels and water pump. The project was implemented by “Shadal” Community Development Council (CDC) through Ru-WatSIP of MRRD in four months.

Latest news

Mon, Aug 31 2026 11:13 AM
Background image

Coordination meeting held with representatives of institutions by the Ministry of Rural Rehabilitation and Development

A coordination meeting, led by His Excellency Al-Hajj Mullah Abdul Latif Mansour, Minister of Rural Rehabilitation and Development, was held this morning with representatives of. . .

Sun, May 17 2026 12:31 PM
Background image

The Honorable Minister of Rural Rehabilitation and Development met with the Ambassador of China and his accompanying delegation.

Honorable Alhaj Mullah Abdul Latif Mansoor, Minister of Rural Rehabilitation and Development, met today in his office with Mr. Zhao Xing, the Ambassador of China to Afghanistan, along. . .

Sun, May 10 2026 12:35 PM
Background image

A coordination meeting with representatives of institutions was held by the Ministry of Rural Rehabilitation and Development

The coordination meeting, led by respected Alhaj Mullah Abdul Latif Mansour, Minister of Rural Rehabilitation and Development, took place this morning with representatives of various. . .

BACK TO NEWS