Handing over of a drinking water network in Samangan province

Ehsan_admin
Sat, Feb 29 2020 9:07 AM
سمنگان

With the total cost of 1.7 million AFNs , the construction work of a drinking water network completed and handed over through the Citizens’ Charter National priority program of the Rural Rehabilitation and Development Ministry (MRRD) in Shurab village of Kharam and sar ebagh district of Samangan province.
This network is 1628 meters long and consists one water reservoir and nine water taps. It is worth to be stated that by the construction of the mentioned network 80 families got access to clean drinking water.

Latest news

Wed, Sep 23 2026 5:41 AM
Background image

معین امور آبادی دهات وزارت احیا و انکشاف دهات از دریای کنر دیدن نمود

بر اساس حکم ریاست‌ الوزراء امارت اسلامی افغانستان و فیصله معاونیت اقتصادی، وزرای محترم وزارت ‌های آب و انرژی، زراعت و مالداری، صنعت و تجارت، و الحاج محمد ارسلاح خروتی معین امور آبادی. . .

Mon, Aug 31 2026 6:43 AM
Background image

Coordination meeting held with representatives of institutions by the Ministry of Rural Rehabilitation and Development

A coordination meeting, led by His Excellency Al-Hajj Mullah Abdul Latif Mansour, Minister of Rural Rehabilitation and Development, was held this morning with representatives of. . .

Sun, May 17 2026 8:01 AM
Background image

The Honorable Minister of Rural Rehabilitation and Development met with the Ambassador of China and his accompanying delegation.

Honorable Alhaj Mullah Abdul Latif Mansoor, Minister of Rural Rehabilitation and Development, met today in his office with Mr. Zhao Xing, the Ambassador of China to Afghanistan, along. . .

BACK TO NEWS