Work progress of a water supply network construction project costing 10 million AFN in Sar e pul province

content_manager
Wed, Sep 02 2020 1:56 PM
جریان کار ساخت یک شبکه‌ی آبرسانی به ارزش ۱۰ میلیون افغانی در سرپل

Construction of a water supply network worth 10 million AFN will be completed soon by the Ministry of Rural Rehabilitation and Development (MRRD) in Aabkhor village of Gusfandi district of Sar e pul province.
The network, which will be built in 3 parts with a total length of 14.353 km, has 50 solar panels, concrete iron water reservoir, 6 pressure breakers storage, 3 pressure beakers and 51 water taps.
It is worth to be stated that the mentioned network has been 98% completed and by it’s completion 571 families will gain access to clean drinking water.

Latest news

Mon, Mar 09 2026 1:52 PM
Background image

Meeting between the Honorable Minister of Rehabilitation and Rural Development and the UNICEF Representative

Today, Alhaj Mullah Abdul Latif Mansoor, the Minister of Rehabilitation and Rural Development, met with Dr. Tajudeen Oyewale, the Representative of the UNICEF Office in Afghanistan, and. . .

Wed, Mar 04 2026 12:29 PM
Background image

The Honorable Minister of Rehabilitation and Rural Development met with the Head of the UNDP Office and his accompanying delegation

Today, Alhaj Mala Abdul Latif Mansoor, the Minister of Rehabilitation and Rural Development, met with Mr. Stephen Rodricks, the Head of the UNDP Office, and his accompanying delegation. . .

Mon, Feb 02 2026 9:15 AM
Background image

Coordination Meeting Held Between the Ministry of Rural Rehabilitation and Development and Representatives of Institutions

Today, before noon, under the leadership of the Honorable Minister of Rural Rehabilitation and Development, Al-Haj Mullah Abdul Latif Mansoor, a coordination meeting was held with. . .

BACK TO NEWS